# PROCESS ATTRIBUTE SCOPE The performance management process attribute is a (Measure = An activity to achieve a certain intent.) of the extent to which the performance of the process is managed. # PROCESS ATTRIBUTE ACHIEVEMENTS
-
A1
(Strategy =
- Identifies what needs and objectives or goals there are to be satisfied.
- Establishes the options and approach for satisfying the needs, objectives, or goals.
- Establishes the evaluation criteria against which the strategic options are evaluated.
- Identifies any constraints/risks and how these will be addressed.
- Identifies what needs and objectives or goals there are to be satisfied.
- A2 Performance of the process is planned.
- A3 Performance of the process is monitored and adjusted to meet the planning.
- A4 Needs for human resources including responsibilities and authorities for performing the process are determined.
- A5 Needs for physical and material resources are determined.
- A6 Persons performing the process are prepared for executing their responsibilities.
- A7 Physical and material resources for performing the process are identified, made available, allocated and used.
- A8 Interfaces between the involved parties are managed to ensure both effective communication and the assignment of responsibilities.
GP2.1.1
Identify the objectives and define a strategy for the performance of the process. (
A1 )
GP2.1.2
Plan the performance of the process. (
A2 )
GP2.1.3
Determine resource needs. (
A4, A5 )
GP2.1.4
Identify and make available resources. (
A6, A7 )
GP2.1.5
Monitor and adjust the performance of the process. (
A3 )
Systems Engineering aligned with Safety, Security and SPICE - from a practical point of view
Sponsored
Unclear requirements, missing traceability, and an unstructured architecture can be costly, which is why our training “Systems Engineering aligned with Safety, Security and SPICE – from a practical point of view” demonstrates how structured methods and clear processes enable efficient system development.
Click for more details!
GP2.1.6
Manage the interfaces between involved parties. (
A8 )
13-52
Communication Evidence (
A8 )
Used by these processes:
- MEE.1 Mechanical Requirements Analysis
- MEE.2 Mechanical Architecture and Design
- MEE.3 Mechanical Component Sample Production
- MEE.4 Mechanical Integration and Verification against Mechanical Architecture and Design
- MEE.5 Verification against Mechanical Requirements
- PA2.1 Performance Management
08-62
Communication matrix (
A8 )
Used by these process attributes:
- PA2.1 Performance Management
18-58
Process performance objectives (
A1 )
Used by these process attributes:
- PA2.1 Performance Management
19-01
Process performance strategy (
A1 )
Used by these process attributes:
- PA2.1 Performance Management
13-14
Progress status (
A3 )
Used by these process attributes:
- PA2.1 Performance Management
08-61
Resource allocation (
A6, A7 )
Used by these process attributes:
- PA2.1 Performance Management
17-55
Resource needs (
A4, A5 )
Used by these process attributes:
- PA2.1 Performance Management
08-56
Schedule (
A2, A3 )
Used by these process attributes:
- PA2.1 Performance Management
14-10
Work package (
A2 )
Used by these process attributes:
- PA2.1 Performance Management